Hi, maybe I'm doing something wrong, but since the site update all I can see in the value guide graph is a flat line as the date is set to 1970.
I'm assuming that I can set the range of this to look at new and no-so-new sets and their performances over specified time frames, but I can's see how to.
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Hi, maybe I'm doing something wrong, but since the site update all I can see in the value guide graph is a flat line as the date is set to 1970.
I'm assuming that I can set the range of this to look at new and no-so-new sets and their performances over specified time frames, but I can's see how to.
Here's what I'm seeing: